Industry: Precision Engineering & Capital Goods
Company Size: Large Enterprise
Challenge Type: WMS Deployment + ERP Integration
Location: Multi-plant operation, Western India
Timeline: 90-day phased deployment
A precision engineering manufacturer ran stores and finished-goods inventory on spreadsheets that reconciled only at month-end.
Buyers ordered against numbers that were weeks stale, so safety stock kept climbing while line-side shortages continued.
Rebuilt the bin-level location master and reconciled physical stock against book records before any system went live.
Configured putaway, picking, and cycle-count rules to the plant's actual material-movement patterns.
Connected the WMS to the existing ERP so goods receipt, issue, and consumption post once and stay in step.
Moved store-by-store with parallel running and operator training, so no phase went live without a verified count.
0%
Lower Inventory Holding
0.1%
Pick Accuracy
0 Days
Deployment to Go-Live
0%
Real-Time Stock Visibility
How a structured VMI model reduced inventory costs and improved OTIF.
Deployment blueprint for high-volume returns and faster disposition.
India's third-party logistics market is scaling fast. Here's what's fuelling the growth and how shippers should respond.