Industry: Precision Engineering & Capital Goods
Company Size: Large Enterprise
Challenge Type: WMS Deployment + ERP Integration
Location: Multi-plant operation, Western India
Timeline: 90-day phased deployment
A precision engineering manufacturer ran stores and finished-goods inventory on spreadsheets that reconciled only at month-end.
Buyers ordered against numbers that were weeks stale, so safety stock kept climbing while line-side shortages continued.
Rebuilt the bin-level location master and reconciled physical stock against book records before any system went live.
Configured putaway, picking, and cycle-count rules to the plant's actual material-movement patterns.
Connected the WMS to the existing ERP so goods receipt, issue, and consumption post once and stay in step.
Moved store-by-store with parallel running and operator training, so no phase went live without a verified count.
0%
Lower Inventory Holding
0.1%
Pick Accuracy
0 Days
Deployment to Go-Live
0%
Real-Time Stock Visibility
Transitions rarely fail on strategy. They fail on the opening stock balance, the interface that was not ready, and the material that was in transit on cutover day.
Before GST, warehouse locations were a tax decision. After it, they became a logistics decision - and a lot of networks are still shaped by the older logic.
Most 3PL selections are decided on price and a site visit. Neither predicts how the arrangement performs on a bad day, which is the only day that tests it.